CedarCopilot wants to merge 1 commit into main from staging
Live on prod, no production signal yet
Strict CloudWatch fallback saw 4,197 success-shaped log lines matching pipeline, analytics, quota, aop, but no tied operation was present, so Libra is not calling this working.
Strict CloudWatch fallback saw 1 setup or missing-connection failure log lines matching auth, login, session, token, but that does not prove the deployed behavior is broken for connected users.
Strict CloudWatch fallback found 3 prod failure log lines for mirror.upsertEmailThread failed (write CONNECTION_CLOSED aws-1-us-east-2.pooler.supabase.com:6543), but this domain-wide failure family is not tied to this intent.
Strict CloudWatch fallback saw 3,724 success-shaped log lines matching calendar, meeting, meetings, but no tied operation was present, so Libra is not calling this working.
Strict CloudWatch fallback found 3 prod failure log lines for mirror.upsertEmailThread failed (write CONNECTION_CLOSED aws-1-us-east-2.pooler.supabase.com:6543), but this domain-wide failure family is not tied to this intent.
Strict CloudWatch fallback found 91 recent prod failure log lines for [UpdateExternalCrmWorkflow] Driver update failed (Step updateOpportunityField failed: HTTP 400: [{\), but the same failure had 128 log lines in the comparable pre-deploy baseline. Libra is not blaming this PR.
single_user
single_user
Libra has verdicts on 0 of 10 tracked behaviors on prod; 10 are still being checked. Libra attributed 2 failures to this change at medium confidence and is still confirming them. Libra checks hourly for 3 days after each deploy.
Libra has not measured any production surfaces for this change yet.