CedarCopilot wants to merge 2 commits into main from staging
Not deployed
Libra has no production signal for this change yet because it has not deployed. Libra checks hourly for 3 days after each deploy.
This change adds Slack-channel webhook sources for playbooks, improves conversation-file interactions and attachment loading, and supports unlinking, relinking, and restoring Drive files. It also introduces sibling-relative frontend imports that conflict with the repository’s required import convention.
The product behavior covered by the change is ready to merge after the required frontend import-style cleanup.
The final finding is one non-security P2 style violation. Under the scoring policy, a nonempty set containing only P2 findings receives a score of 4.
Files Needing Attention: apps/mail/modules/conversations/components/files/optimistic-files.ts and the associated changed mail tests should use the repository’s absolute frontend import convention.
### Issue 1
apps/mail/modules/conversations/components/files/optimistic-files.ts:41-51
**Relative frontend imports**
These new sibling-relative imports diverge from the repository's absolute-import convention, increasing inconsistency and making module refactors and import enforcement less reliable. The same pattern occurs in the associated changed mail tests.
---
For each issue above, determine whether it is valid and should be fixed. If so, fix it directly.
Reviews (1): Last reviewed commit: "Merge pull request #2580 from CedarCopil..." | Re-trigger Greptile
Greptile also left 1 inline comment on this PR.
Context used:
Libra has not measured any production surfaces for this change yet.