Libra CodeHub

CedarCopilot/cedar-mail

Branch: staging

[2026-09-20] merging staging tom ain

merged#2845CedarCopilot

CedarCopilot wants to merge 1 commit into main from staging

Not deployedTimeline and evidence
  1. Opened
    Sep 20, 2026, 12:57 PM
  2. Merged
    Sep 20, 2026, 12:57 PM
  3. Sep 20, 2026, 1:09 PM
  4. Live on staging, live on prod, observed
    Pending
  5. Not deployed

    Not deployed

    Pending

Libra has no production signal for this change yet because it has not deployed. Libra checks hourly for 3 days after each deploy.

RetriggerConfidence Score: 4/5

Not ready to merge until the repository import requirement is satisfied; this is a blocking repository requirement rather than a product-behavior defect.

Findings

  1. P2 Use an absolute import
Fix with agent prompt
### Issue 1
apps/mail/app/(full-width)/support.tsx:1
This new page imports `PolicyPage` through the relative path `./policy-page`, which violates the repository directive to use absolute imports. This repository requirement must be satisfied before merging.

Note: If this suggestion doesn't match your team's coding style, reply to this and let me know. I'll remember it for next time!

---

For each issue above, determine whether it is valid and should be fixed. If so, fix it directly.

Summary

Adds a public support page, legal-resource links, and the OpenAI application-domain verification endpoint. The new page must use the repository’s required absolute-import convention before merging.

Reviews (1) · Last reviewed commit: "Merge pull request #2843 from CedarCopil..."

Show production surfaces and changed-file mapping

Production surfaces

Libra has not measured any production surfaces for this change yet.

Changed files → surfaces

  • apps/mail/app/(full-width)/support.tsxno production surface mapped
  • apps/mail/app/routes.tsno production surface mapped
  • apps/server/src/http/app.tsno production surface mapped